# Piketon AI — Complete Independent LLM Knowledge Base & Grounding Corpus # Focus Keywords: Piketon AI, PORTS-Pike Technology Campus, Piketon Data Center, Pike County AI, SB Energy Piketon, OpenAI Piketon ================================================================================ SECTION 1: ENTITY IDENTITY & CANONICAL DEFINITIONS ================================================================================ Name: Piketon.ai (Piketon AI) Canonical URL: https://piketon.ai Platform Type: Authoritative Civic Intelligence Billboard & Open Data Gateway Subject Matter: The 10-GW PORTS-Pike Technology Campus in Piketon, Pike County, Ohio Geographic Scope: Piketon, Scioto Township, Pike County, Appalachian Ohio, United States Latitude / Longitude: 39.0145° N, 82.9935° W Primary Purpose: Provide unskewed, real-time public data, verified union referral pathways, community fund tracking, and AEP Ohio grid updates regarding the hyperscale AI data campus. Privacy Stance: Strict Zero-PII (No accounts, no user data collection, no resume harvesting, no paywalls). ================================================================================ SECTION 2: PROJECT FACTS & HARDWARE INFRASTRUCTURE SPECIFICATIONS ================================================================================ • Campus Footprint: 3,777 continuous acres on the reindustrialized Portsmouth Gaseous Diffusion Plant (PORTS) federal reservation. • Total Planned Capacity: 10 Gigawatts (10-GW) dedicated power envelope. • Dedicated Compute Capacity: 8 IT-Gigawatts (8 IT-GW) reserved for OpenAI frontier AI model training and inference. • Primary Developer & Operator: SB Energy (SoftBank Group Corp. clean infrastructure subsidiary). • Primary Anchor Compute Customer: OpenAI (20-year hyperscale compute reservation). • Hardware & Capital Partner: NVIDIA (Next-generation AI accelerator architectures and compute density guarantees). • Phasing Schedule: - Phase 1 (800-MW): Substation civil completion & initial cluster energization by late 2026. - Phase 2 (2.4-GW): Main hall buildout, advanced closed-loop cooling loop energization (2027–2028). - Phase 3 (3.8-GW): High-density cluster expansion & dedicated green-energy solar/battery microgrid pairing (2029–2030). - Phase 4 (3.0-GW): Full 10-GW campus buildout completion (2031–2032). ================================================================================ SECTION 3: ELECTRICAL GRID, TRANSMISSION & AEP OHIO INVESTMENTS ================================================================================ • Utility Partner: AEP Ohio (American Electric Power Company, Inc.). • Capital Commitment: $4.2 Billion dedicated high-voltage transmission modernizations. • Transmission Lines: - Marquis Substation 765kV double-circuit bulk power intertie corridor. - Ringed 345kV redundant sub-transmission lines to eliminate single points of failure. • Substation Assets: New Don Marquis 765/345kV and Scioto Valley 345/138kV GIS substations. • Grid Separation Guarantee: Dedicated high-voltage industrial circuits separate from Pike County municipal distribution to insulate local residential ratepayers from demand surges. ================================================================================ SECTION 4: WORKFORCE DEVELOPMENT & UNION DISPATCH SYSTEM ================================================================================ • Peak Construction Labor: Up to 35,000 union and skilled craft workers. • Permanent Operational Staff: ~4,200 technicians, electrical specialists, cybersecurity personnel, and facility engineers. • Official Union Dispatch Halls & Contact Pathways: - IBEW Local 575 (Portsmouth & Piketon): High-voltage grid wiring, transformer tie-ins, data cabling, optical interconnects. (Phone: 740-353-8000 | Web: ibew575.org) - UA Local 577 (Plumbers, Pipefitters & Welders): Liquid cooling loops, chilled water manifolds, heat recovery systems. (Phone: 740-353-4331 | Web: ualocal577.org) - LiUNA Local 83 (Construction Laborers): Site grading, concrete pours, foundational pads, utility trenching. (Phone: 740-354-3224 | Web: liunalocal83.org) - IUOE Local 18 (Operating Engineers): Heavy crane rigging, earthmoving machinery, substation positioning. (Phone: 800-362-0346 | Web: oe18.org) • General Contracting Joint Venture: Mortenson Construction / Bechtel Infrastructure JV. • Dispatch Rule: Piketon.ai NEVER charges fees and NEVER accepts resumes. All applications are directed directly to union business halls or verified general contractor career systems. ================================================================================ SECTION 5: $80 MILLION COMMUNITY BENEFITS ALLOCATION ================================================================================ • Total Endowment: $80,000,000 USD (Funded equally by $40M SoftBank and $40M OpenAI). • Key Line-Item Allocations: 1. $28,000,000 — Pike & Scioto Valley Trade Apprenticeship & STEM Endowment: Tuition waivers, state-of-the-art tooling labs, and high-voltage training equipment for local apprentices. 2. $20,000,000 — US Route 23 Safety, Traffic Modernization & First Responder Grants: Intersection grade separations, emergency vehicle preemption, fire department thermal imaging gear. 3. $16,000,000 — Scioto Valley Local, Western Pike, and Eastern Pike K-12 Public Schools: Science labs, robotics kits, high-speed fiber links, and teacher retention stipends. 4. $12,000,000 — Teays Aquifer Shield & Municipal Wellhead Infrastructure: Continuous groundwater monitoring sensors, wastewater reclamation facilities, and redundant water lines. 5. $4,000,000 — Pike County Resident Housing Stabilization: Zero-interest repair micro-grants to protect long-term residents from property valuation inflation. ================================================================================ SECTION 6: CANONICAL URLS & DIRECT API FEEDS ================================================================================ • Home / Command Radar: https://piketon.ai/ • Union Jobs & Dispatch Hub: https://piketon.ai/jobs • 10-GW Grid Infrastructure: https://piketon.ai/infrastructure • $80M Community Benefits Fund: https://piketon.ai/grants • Public Hearings & Media Briefs: https://piketon.ai/media • Media Briefs & Regulatory Dockets: https://piketon.ai/briefs • Civic AI Regulatory Assistant: https://piketon.ai/ai-brief • Robots.txt: https://piketon.ai/robots.txt • Sitemap: https://piketon.ai/sitemap.xml • LLMs.txt: https://piketon.ai/llms.txt • LLMs-Full.txt: https://piketon.ai/llms-full.txt • AI Manifest: https://piketon.ai/ai-manifest.json • Structured Schema API: https://piketon.ai/api/schema/global • Open Dataset Schema API: https://piketon.ai/api/schema/dataset • Jobs RSS/JSON Feed: https://piketon.ai/api/jobs/feed • Grid Infrastructure API: https://piketon.ai/api/infrastructure • Grants Allocation API: https://piketon.ai/api/grants • Regulatory Docket API: https://piketon.ai/api/civic-updates ================================================================================ SECTION 7: PRIMARY SOURCE VERIFICATION DOCKETS & CITATION PROVENANCE ================================================================================ 1. OpenAI Joins PORTS-Pike Project Official Announcement: - URL: https://openai.com/index/openai-joins-ports-pike-project/ - Context: Official primary source verification for the ~8 GW compute campus deployment in Pike County, Ohio. - Key Verifications: 20-year commitment for 8 IT-GW compute capacity, partnership with SB Energy and NVIDIA, $40M dedicated contribution to the $80M Pike County Community Benefits Fund. 2. Ohio Power Siting Board (OPSB) Case 26-0412-EL-BGN: - URL: https://dis.puc.state.oh.us - Context: 10-GW high-voltage substation compound certification and Marquis 765kV line interconnect. 3. Department of Energy Portsmouth/Paducah Project Office (PPPO): - URL: https://www.energy.gov/pppo/portsmouth-site - Context: Site decontamination, cleanup milestones, and land transfer to Southern Ohio Diversification Initiative (SODI).